Tutorial 4 — Two-Stage Stochastic Optimisation
===============================================

The previous tutorials optimise against a **single** year. But the right
investment under 2023 prices may be wrong under 2025 prices. **Two-stage
stochastic optimisation** finds *one* set of investment decisions
(*here-and-now*) that performs best in expectation across several scenarios,
while **dispatch adapts per scenario** (*wait-and-see*).

We reuse the **brownfield** plant from :ref:`tutorial-2-brownfield` and optimise
it across three weather/market scenario years (2022 / 2023 / 2024) at once.

.. contents:: On this page
   :local:
   :depth: 1

---

1 · The two-stage idea
----------------------

.. math::

   \min_{\text{capacities}}\; \sum_{s} p_s \,
   \big[\, \text{CAPEX}^{\text{ann}} + \text{OPEX}_s \,\big]

Investment variables are **shared** across scenarios :math:`s` (you build one
plant); operational variables are **scenario-specific** (each year is dispatched
on its own prices and renewable profiles). Scenarios carry a probability
:math:`p_s` summing to 1. The objective is the **expected** annual cost.

---

2 · Run it
----------

.. code-block:: bash

   cp tutorials/4_stochastic/config.yaml   config/config.yaml
   cp tutorials/4_stochastic/n_config.yaml config/n_config.yaml
   snakemake --cores 4     # downloads/preprocesses all scenario years first

.. code-block:: yaml

   stochastic:
     stochastic: true
     EVPI: false
     # scenarios 2022/2023/2024 and their weights are set in config.default.yaml

.. admonition:: Stochastic needs a pure LP — two required changes
   :class: caution

   The ``tutorials/4_stochastic/n_config.yaml`` already applies these; they are
   the reason it differs from the Tutorial 2 brownfield n_config:

   #. **No unit commitment** — ``committable: false`` everywhere (stochastic
      cannot use binary variables).
   #. **No ramp limits** — set ``ramp limit up`` / ``ramp limit down`` to
      ``null`` for electrolysis, methanolisation and biomethanation. PyPSA
      (≤ 1.2.2) cannot build ramp-limit constraints on a scenario network, and a
      value such as ``1`` still builds them — only ``null`` disables them. See
      :ref:`guide-stochastic` → *Limitations*.

The output folder uses the ``STC`` token instead of ``DET``.
Temporal resolution is set to ``3h`` to keep solve time manageable.

---

3 · Interpret the results
-------------------------

The three scenarios span very different market conditions (2022 = energy-crisis
year; 2023/2024 = post-crisis normalization), with weights 10 % / 40 % / 50 %:

.. figure:: /_static/tutorials/tut4_inputs_LDC_by_scenario.png
   :width: 95%

   Input duration curves for all three scenarios. **2022** was the European
   energy-crisis year — elevated NG and biomethane prices made this by far the
   most profitable scenario (€30.0 M/y net). **2023** and **2024** show post-crisis
   normalization (€5.4 M/y and €3.5 M/y). The 90 % combined weight on 2023/2024
   governs the final design.

The optimizer finds **one** investment that is robust across all three years:

.. figure:: /_static/tutorials/tut4_Opt_capacities_SP_vs_WS.png
   :width: 95%

   Stochastic-programme (SP) optimal investments: **electrolyser 4.7 MW**,
   **biogas upgrading 27.9 MW**, **biomethanation 1.8 MW**, battery 0.9 MWh.
   Existing brownfield assets (52 MW wind, 30 MW solar, 62.85 t/h DM biogas
   digester) carry over from Tutorial 2.

The expected cost breakdown reveals which revenue streams justify the design:

.. figure:: /_static/tutorials/tut4_TSC_by_carrier.png
   :width: 95%

   Expected total system cost (probability-weighted) by carrier/agent.
   **Biomethane export (bioCH4)** dominates revenues at ≈ €18.1 M/y, followed
   by district heating (€5.1 M/y) and methanol (€1.8 M/y). Fixed CAPEX
   (€16.0 M/y, identical across scenarios) is largely the brownfield wind,
   solar and biogas-digester assets. **Expected net profit: €6.9 M/y.**

Shadow prices show the internal marginal value of each carrier:

.. figure:: /_static/tutorials/tut4_shd_prices_mean_bar.png
   :width: 95%

   Energy-weighted mean shadow prices and annual throughput. Biomethane
   collection (€14.3/MWh) is the marginal cost of routing additional biogas
   to upgrading. The negative H₂ delivery price (−€12.1/MWh) reflects
   hydrogen's role as a consumed intermediate in biomethanation rather than
   a delivered product.

The same fixed-capacity plant dispatches differently in each scenario:

.. figure:: /_static/tutorials/tut4_CF_operation_by_scenario.png
   :width: 95%

   Per-scenario utilization duration curves. Biogas upgrading runs near full
   capacity year-round in all three scenarios. The small electrolyser (4.7 MW)
   operates more intensively in 2022 (cheap/negative electricity hours) and
   more selectively in 2023–2024.

.. admonition:: Key results
   :class: important

   - **Expected net profit: €6.9 M/y**
     (0.10 × €30.0 M + 0.40 × €5.4 M + 0.50 × €3.5 M). The 2022 energy-crisis
     scenario is far more profitable but carries only 10 % weight; the design
     is governed by 2023–2024 conditions.
   - The stochastic design is a **hedge**: biogas upgrading (27.9 MW) is
     built fully because it earns robust revenue in all three years. The
     electricity-sensitive electrolyser (4.7 MW) is small — sized to exploit
     cheap-electricity hours without over-betting on any single price environment.
     Biomethanation is minimal (1.8 MW) for the same reason.
   - The **same capacity** runs very differently across years: the electrolyser
     is used more aggressively in 2022, more selectively in 2023–2024. This
     wait-and-see dispatch flexibility is what makes the stochastic design viable.
   - Here ``EVPI: false``. Set ``EVPI: true`` to also solve each year with
     perfect foresight and quantify the **Expected Value of Perfect
     Information** — the annual value of knowing next year's market in advance.

---

What you learned
----------------

- The **here-and-now vs wait-and-see** two-stage structure and expected-cost objective.
- How to enable stochastic mode and the **pure-LP requirements** (no committable,
  null ramp limits).
- Reading a stochastic design as a **robust hedge** across scenarios, and
  interpreting scenario-level profitability spreads.

This is the final tutorial in the core sequence. For exploring *near-optimal*
alternatives to a single design, see the near-optimal (MGA) guide.