Tutorial 3 — Rolling Horizon Dispatch
=====================================

Capacity expansion decides *what to build*; **rolling horizon** decides *how to
operate* a fixed plant through the year, one sliding window at a time — closer to
how a plant is actually run, and without perfect foresight over all 8760 hours.

This tutorial takes the **solved brownfield network from** :ref:`tutorial-2-brownfield`
and re-solves only its **dispatch**.

.. contents:: On this page
   :local:
   :depth: 1

---

1 · How rolling horizon works
-----------------------------

The full year is solved in overlapping windows (here **168 h** windows with a
**72 h** overlap). Each window is optimised with the end-of-previous-window state
as its start; the overlap is discarded to avoid end-of-horizon artefacts.
Capacity expansion is **bypassed entirely** — capacities are read from the
``network_path`` network and held fixed.

.. important::

   Rolling horizon is **dispatch-only** and runs at full **hourly** resolution
   (temporal clustering is ignored). It needs a previously solved, fixed-capacity
   ``*_OPT.nc`` — so **run Tutorial 2 first**.

---

2 · Run it
----------

.. code-block:: bash

   # 1) ensure Tutorial 2 has produced its *_OPT.nc
   # 2) point network_path at it (already pre-filled; edit if your path differs)
   cp tutorials/3_rolling_horizon/config.yaml   config/config.yaml
   cp tutorials/3_rolling_horizon/n_config.yaml config/n_config.yaml
   snakemake --cores 4

.. code-block:: yaml

   rolling_horizon:
     enabled:      true
     horizon:      168       # window length (h)
     overlap:       72       # overlap (h)
     rh_year:      2024
     network_path: 'outputs/single_analysis/tut2_brownfield_heat/networks/B_H_RE_H2_METH_SN_ST_CO2_100_tD_H2_580_MeOH_0_CH4_262_2024_El_0.1_DET_3h_tut2_brownfield_heat_OPT.nc'

.. admonition:: Committable units are supported in rolling horizon
   :class: tip

   Unlike stochastic mode, rolling horizon **can** use unit commitment: each
   window is solved as its own (small) MILP, so ``committable: true`` on a
   fixed-capacity asset is valid here (the ``min load`` / ``committable`` note in
   ``n_config.default.yaml`` reads *"only for initial capacity or RH"*). This
   tutorial leaves committable at its default ``false``; you can switch it on for
   a fixed (``expansion: false``) asset to see on/off cycling in the dispatch.

The output network name gets an ``_RH`` suffix, and plots land in
``outputs/single_analysis/<run_name>/plots_rh/``.

---

3 · Interpret the results
-------------------------

The RH plot suite (in ``plots_rh/``) adds two **PF-vs-RH comparison** figures.

.. figure:: /_static/tutorials/tut3_PF_vs_RH_total_cost.png
   :width: 95%

   Net total cost by carrier: perfect foresight (PF) vs rolling horizon (RH).
   Both are dominated by the same fixed CAPEX; the difference lies in OPEX.

.. admonition:: PF vs RH: how much does limited foresight cost?
   :class: important

   - **PF net ≈ −€48.7 M/y**, **RH net ≈ −€48.6 M/y**: rolling horizon is
     only **€112 k/y (0.23 %) less profitable** than perfect foresight. The
     plant operates almost as well without knowing the full year in advance.
   - This small gap makes physical sense: the plant's main storage is a battery
     with **2 hours** of capacity, far shorter than the 168 h window. A battery
     can only shift energy within its charge cycle, so extending the lookahead
     horizon beyond a few hours adds almost nothing. Seasonal storage or longer
     thermal buffers would widen the PF–RH gap.
   - Perfect foresight **is** the upper bound (the PF solve sees all 8760 h
     simultaneously), so the small positive delta confirms the rolling-horizon
     implementation is correct.
   - The carrier breakdown shows the gap is spread across dispatch-driven items
     (biomethane revenue, grid export) rather than any single bottleneck.

.. figure:: /_static/tutorials/tut3_CF_operation_by_scenario.png
   :width: 95%

   Utilization LDCs under rolling horizon: the same capacity profile as Tutorial
   2, now re-dispatched hour-by-hour with a 168 h lookahead window.

---

4 · PF vs RH — operation patterns side by side
-----------------------------------------------

The aggregate cost gap (€112 k/y) is small, but the individual asset dispatch
patterns reveal *where* the differences lie. The figure below shows, for each
key component, a **day-of-year × hour** heatmap comparing PF (left) against RH
(right):

.. figure:: /_static/tutorials/tut3_PF_vs_RH_heatmaps.png
   :width: 100%

   Operation heatmaps — perfect foresight (left) vs rolling horizon (right) for
   four components. Each cell is the mean capacity factor for that hour-of-day
   and day-of-year.

Reading the heatmaps:

- **Battery SOC** — the most visible difference. PF charges the battery with
  precise timing (notably in summer, when solar surplus is predictable far in
  advance); RH tends to keep SOC flatter and slightly higher on average because
  it cannot see more than 168 h ahead and hedges conservatively. Neither pattern
  is "wrong" — they reflect different information horizons.
- **Electrolyser CF** — both show the same seasonality (more operation in
  spring/autumn when wind is strong and prices are low), but RH produces a
  noisier pattern with less clean clustering of cheap-power hours. The small
  electrolyser (2.5 MW new capacity on top of the brownfield plant) amplifies
  these timing differences relative to total plant output.
- **Biogas upgrading CF** — nearly identical in PF and RH. Upgrading runs as
  near-baseload in both cases because its input (biogas from the digester) is
  continuous and its output has a fixed biomethane demand. No foresight advantage.
- **Biomethanation CF** — also very similar. High-CF baseload operation means
  the 168 h window is more than enough lookahead; there is nothing to gain from
  knowing the full year.

The heatmaps confirm the economic conclusion: **the battery is the only asset
that meaningfully benefits from longer foresight**, and with only 2 hours of
capacity that benefit is small. Adding a larger thermal or hydrogen store would
make the PF–RH gap — and the visual difference in these heatmaps — much larger.

---

What you learned
----------------

- The difference between perfect-foresight expansion and **rolling-horizon dispatch**.
- ``horizon`` / ``overlap`` window mechanics and the ``network_path`` input.
- Why short-duration storage makes the PF–RH gap small, and when it would widen.

Next: :ref:`tutorial-4-stochastic` optimises the *investment* against several
scenarios at once.

.. seealso::

   :ref:`guide-rolling-horizon` · :ref:`guide-outputs` · :ref:`config-rolling-horizon` · :ref:`tutorial-2-brownfield`